Client:
Olympic Coordination Authority
Location: Horsley
Park NSW
Size: 80 ha
Project value: $36,000,000
The design responds to the historic and environmentally sensitive
nature of the site. The layout of the buildings and arenas sit in the contours
in a responsive manner. The building forms respond to the idea of an Equestrian
facility, the site context, and the ESD principals incorporated in the design.
Environmentally sustainable design principles were applied to aspects of the
design including water management and run off control, natural lighting and
thermal comfort of the buildings. The benefits of these principles will reflect
in the management and running costs of the facility.
|
|
|
|